Notice: Undefined variable: result in ain30_preprocess_node() (line 713 of /home/ainold/_OLDAIN/docroot/sites/ainonline.com/themes/ain30/template.php).
User warning: The following module is missing from the file system: rules_admin. For information about how to fix this, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1181 of /home/ainold/_OLDAIN/docroot/includes/bootstrap.inc).
Automatic dependent surveillance broadcast (ADS-B) is poised to make the transition from promising technology to fundamental air traffic management tool, a
One of the recurrent themes at the Toulouse workshop was the inability of ATC services to provide operators opportunities to use the navigation performance
The FAA has implemented performance- based navigation in the form of standard instrument departures (SIDs), en route Q and T routes, standard arrival route
Eurocontrol provided a short guide to RNP and Rnav concepts and terminology as a primer for delegates.<br />
<br />
Area navigation (Rnav) performance le
Performance-based navigation was identified in ICAO’s Future Air Navigation System concept of the early 1990s, which defined required navigation performanc
Airservices Australia CEO Greg Russell made the trip to Maastricht to sign a partnership agreement with Francesco Violante, his counterpart at datalink ser
While European ATM research focuses on the 2020-oriented Sesar program and the FAA has picked 2025 as the date for implementation of its new system,<br />p
Last November saw the signature in Brussels of a contract covering the definition phase of the single European sky (SES) implementation program (Sesar, for
The single European sky legislation, with its provision for the creation by groups of states of cross-border functional airspace blocks within which multip